| 1 kW PEMFC system production | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| 1kW PEMFC BoP production | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Alkaline water electrolyzer package (1 kg H₂/hr hydrogen production) | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Gaseous hydrogen refueling station, Jeolla region | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Hydrogen equipment building construction | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Hydrogen production, SMR | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Hydrogen production, SMR with CCS (56% CO₂ capture) | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |
| Hydrogen production, SMR with CCS (90% CO₂ capture) | LCI result | KR | Materials production / Other materials | 2026 | 2028 | |